Eileena Long
  • Home
  • Who We Are / Project Team▼
    Who We Are / Project Team▼
    • Who We Are
    • Building Committee
    • Owner's Project Manager
    • Designer
    • MSBA
    • Construction Manager
  • Documents▼
    Documents▼
    • Glossary of Terms
    • Statement of Interest
    • Enrollment Certification
    • Feasibility Study Agrmt.
    • MSBA Feasibility Approval
    • MSBA SD Approval
    • MSBA Module Timeline
  • Agendas, Minutes, Reports▼
    Agendas, Minutes, Reports▼
    • Agendas, Minutes, Reports
  • MSBA Submissions▼
    MSBA Submissions▼
    • Prelim. Design Program
    • Preferred Schematic Rpt.
    • Schematic Design
    • Design Development
    • 60% Construction Docs
    • 90% Construction Docs
  • Facts▼
    Facts▼
    • FAQ
  • Media
  • Current Drawings

90% Construction Documents [CD] MSBA Submission

FRES 90% CD Table of Contents & Acknowledgements

FRES 90% CD Summary Contents

FRES 90% CD OPM Deliverables

FRES 90% CD Designer Deliverables

FRES 90% CD Appendix

FRES 90% CD Project Manual Specifications Volume 1

FRES 90% CD Project Manual Specifications Volume 2

FRES 90% CD Drawing Cover Sheet

FRES 90% CD Civil Drawings

FRES 90% CD Egress Drawings

FRES 90% CD General Notes

FRES 90% CD Landscaping Drawings

FRES 90% CD Structural Drawings

FRES 90% CD Architectural Drawings A000-A122

FRES 90% CD Architectural Drawings A101D-A354

FRES 90% CD Architectural Drawings A400-A801

FRES 90% CD FF&E Drawings

FRES 90% CD Fire Protection Drawings

FRES 90% CD Electrical Drawings

FRES 90% CD Tele Data Drawings

FRES 90% CD HVAC Drawings


 

© Eileena Long
  • Current Drawings
Powered by ZENFOLIO User Agreement
Cancel
Continue