Eileena Long
  • Home
  • Who We Are / Project Team▼
    Who We Are / Project Team▼
    • Who We Are
    • Building Committee
    • Owner's Project Manager
    • Designer
    • MSBA
    • Construction Manager
  • Documents▼
    Documents▼
    • Glossary of Terms
    • Statement of Interest
    • Enrollment Certification
    • Feasibility Study Agrmt.
    • MSBA Feasibility Approval
    • MSBA SD Approval
    • MSBA Module Timeline
  • Agendas, Minutes, Reports▼
    Agendas, Minutes, Reports▼
    • Agendas, Minutes, Reports
  • MSBA Submissions▼
    MSBA Submissions▼
    • Prelim. Design Program
    • Preferred Schematic Rpt.
    • Schematic Design
    • Design Development
    • 60% Construction Docs
    • 90% Construction Docs
  • Facts▼
    Facts▼
    • FAQ
  • Media
  • Current Drawings

Design Development

FRES DD Table of Contents

FRES DD Acknowledgements 

FRES DD Section 1 Summary of Contents

FloRo DD Section 2 OPM Deliverables

FloRo DD Section 2.1 Commissioning Consultant Review

FloRo DD Section 2.1 District Response to MSBA Comments

FloRo DD Section 2.2 Permitting Schedule

FloRo DD Section 2.3 CM Construction Cost Estimate

FloRo DD Section 2.3 Cost Estimate Comparison 

FloRo DD Section 2.3 Early Bid Packages 

FloRo DD Section 2.3 Value Engineering Log

FloRo DD Section 3 Designer Deliverables

FloRo DD Section 3.4 Designer Cost Estimate
 

© Eileena Long
  • Current Drawings
Powered by ZENFOLIO User Agreement
Cancel
Continue