Eileena Long
  • Home
  • Who We Are / Project Team▼
    Who We Are / Project Team▼
    • Who We Are
    • Building Committee
    • Owner's Project Manager
    • Designer
    • MSBA
    • Construction Manager
  • Documents▼
    Documents▼
    • Glossary of Terms
    • Statement of Interest
    • Enrollment Certification
    • Feasibility Study Agrmt.
    • MSBA Feasibility Approval
    • MSBA SD Approval
    • MSBA Module Timeline
  • Agendas, Minutes, Reports▼
    Agendas, Minutes, Reports▼
    • Agendas, Minutes, Reports
  • MSBA Submissions▼
    MSBA Submissions▼
    • Prelim. Design Program
    • Preferred Schematic Rpt.
    • Schematic Design
    • Design Development
    • 60% Construction Docs
    • 90% Construction Docs
  • Facts▼
    Facts▼
    • FAQ
  • Media
  • Current Drawings

Preferred Schematic Report (PSR)

FloRo PSR 00 Table of Contents

FloRo PSR 01 Introduction

FloRo PSR 02 Evaluation of Existing Conditions

FloRo PSR 03 Final Evaluation of Alternatives

FloRo PSR 04 Preferred Solution

FloRo PSR 05 Local Actions & Approvals

FloRo PSR 06.1.1 School Tours

FloRo PSR 06.1.1 Student Worksheet Samples

FloRo PSR 06.1.1 Sustainability Workshop

FloRo PSR 06.1.6 MSBA PDP Response

FloRo PSR 06.3.1 Site Analysis

FloRo PSR 06.3.6 MEP_FP Report

FloRo PSR 06.3.7 Cost Estimate

FloRo PSR 06.3.8 Land Use Department Form of Intent

FloRo PSR 06.3.8 Massachusetts Historic Commission Response

FloRo PSR 06.3.8 Town of Groton Guide to Permitting 

FloRo PSR 06.4.1 Educational Program – Red-Lined Version 

FloRo PSR 06.4.6 Capital Budget Statement

FloRo PSR 06.4.6 Construction Estimate

FloRo PSR 06.4.6 Municipal Projects 

FloRo PSR 06.4.6 Project Estimate

FloRo PSR 06.5.1 Certified SBC Meeting Information & Pres. Materials
 

© Eileena Long
  • Current Drawings
Powered by ZENFOLIO User Agreement
Cancel
Continue