Eileena Long
  • Home
  • Who We Are / Project Team▼
    Who We Are / Project Team▼
    • Who We Are
    • Building Committee
    • Owner's Project Manager
    • Designer
    • MSBA
    • Construction Manager
  • Documents▼
    Documents▼
    • Glossary of Terms
    • Statement of Interest
    • Enrollment Certification
    • Feasibility Study Agrmt.
    • MSBA Feasibility Approval
    • MSBA SD Approval
    • MSBA Module Timeline
  • Agendas, Minutes, Reports▼
    Agendas, Minutes, Reports▼
    • Agendas, Minutes, Reports
  • MSBA Submissions▼
    MSBA Submissions▼
    • Prelim. Design Program
    • Preferred Schematic Rpt.
    • Schematic Design
    • Design Development
    • 60% Construction Docs
    • 90% Construction Docs
  • Facts▼
    Facts▼
    • FAQ
  • Media
  • Current Drawings

Schematic Design

Schematic Design Drawings

Schematic Design Specifications

DESE Submittal

00_Cover & Table of Contents

01_Introduction

02_Final Design Program

03_Traffic Analysis

04_Enviromental & Existing Building Assessment

05_Geotechnical & Geoenvironmental Analyses

06_Code Analysis & Permit Requirements 

07_Utility & Soils Analysis

08_Massing Study

09_Narrative Building Systems Descriptions 

10_Sustainable Building Design Documents 

11_ADA & MAAB Compliance 

12_MASS Historical Commission

13_Room Data Sheets

14_Construction Methodology

15_Anticipated Reimbursement

16_Budget & Cost Reconciliation 

17_Designer's Cost Estimate 

18_OPM Cost Estimate

19_Project Work Plan

20_Local Actions & Approvals

21_Appendix

 

© Eileena Long
  • Current Drawings
Powered by ZENFOLIO User Agreement
Cancel
Continue